SME Times is powered by   
Search News
Just in:   • PLI scheme has attracted Rs 1.46 lakh crore investment, created 9.5 lakh jobs  • India’s growth momentum has picked up after Q2 slowdown: Jeffries  • Centre pays Rs 4,820 crore to 2.75 lakh farmers for pulses under MSP scheme  • India needs economically-viable tech for infra projects: Nitin Gadkari  • India's private sector growth surges to 4-month high in Dec: Report 
Last updated: 27 Sep, 2014  

APR Energy Hosts Acting US Ambassador at its Botswana Plant

PR Newswire | 29 Jan, 2013
APR Energy Hosts Acting US Ambassador at its Botswana Power Plant

GABORONE, Botswana: During his recent trip to Francistown, the Charge d'Affaires and Acting US Ambassador, Michael Murphy of the U.S. Embassy Gaborone, Botswana took the opportunity to visit APR Energy's 70MW power plant site. The Acting Ambassador toured the facility as part of his campaign to promote trade and commercial ties between Botswana and the United States. During his visit, Mr. Murphy met with APR Energy's plant management to discuss the Company's day-to-day operations in Botswana as well as APR Energy's other power plant facilities around the globe.

"APR Energy's 70MW facility in Francistown is a key component of Botswana's power generation infrastructure, filling a critical gap that provides reliable electricity to power the country's development," said Mr. Murphy.  "Moreover, APR's expanding presence in Botswana is indicative of the opportunity to American firms presented by this country's steady growth trajectory in the power sector and more broadly across the economy." 

This visit is following the recent extension of APR Energy's power contract with the Botswana Power Corporation (BPC), the local national electrical utility. APR Energy has been operating successfully the turnkey diesel power plant for BPC since late 2009, when it was engaged to counteract "electricity shortages driven by demand growth and supply constraints in the Southern Africa region."

The site, located just outside of Francistown, Botswana is one of five turnkey projects that APR Energy currently is operating in Africa, totaling over 200MW of installed power capacity by APR Energy on the continent.

Photos of Mr. Murphy's visit to APR Energy's power plant site in Botswana are available on the APR Energy website here: www.aprenergy.com/media/photo-gallery

About APR Energy
APR Energy specializes in the sale of reliable and efficient electricity through the rapid global deployment of customized, turnkey power solutions. APR Energy's fast-track approach, flexible offerings, and comprehensive operation and maintenance services have established it as a leader in the utility and industrial segments. APR Energy provides its power generation solutions to customers and communities around the world, with an emphasis in Africa, South America, Central America, the Middle East and Asia. APR Energy also implements philanthropic initiatives at each plant location through its Community Development Program, which aims to build and maintain close relationships with its neighbors through projects and donations in health and education.

 
Print the Page Add to Favorite
 
Share this on :
 

Please comment on this story:
 
Subject :
Message:
(Maximum 1500 characters)  Characters left 1500
Your name:
 

 
  Customs Exchange Rates
Currency Import Export
US Dollar
84.35
82.60
UK Pound
106.35
102.90
Euro
92.50
89.35
Japanese Yen 55.05 53.40
As on 12 Oct, 2024
  Daily Poll
Will the new MSME credit assessment model simplify financing?
 Yes
 No
 Can't say
  Commented Stories
 
 
About Us  |   Advertise with Us  
  Useful Links  |   Terms and Conditions  |   Disclaimer  |   Contact Us  
Follow Us : Facebook Twitter